Lucy's profile

Activity for Lucy Goss

Showing: 3 Results
Sort by
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to source the Buka 5.1’s by importing the metal pre-cut and assembling them in Fiji. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key...

Tariq Uddin
by Tariq Uddin
4 Votes
Comments 1
Tariq Uddin
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to manufacture the Bukka 5.1’s locally from locally sourced materials That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials locally to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key Metrics: Cost of materials and...

Stephen Dodd
by Stephen Dodd
3 Votes
Comments 2
Stephen Dodd
Proposed Experiment

Lean Phase: Channels Assumption: That it is feasible to manufacture the Buka 5.1’s locally from imported materials. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month. Time Box: 3 weeks Key Metrics: Cost of materials and...

Lucy Goss
by Lucy Goss
4 Votes
Comments 1
Lucy Goss
 

Lucy Goss

Australia

Joined this community on Jan 3, 2019

University or Company
Monash

Degree or Work area
Engineering

Country you Trekked/are Trekking in
Fiji

Reputation ranking

Ranking
282
Points
67

Following

0 in this community