Experiment Results   Reference the Experiment Design Post 181230 [EXPERIMENT DRAFT] Supply Chain: local materials, local manufacture EMP   Reassert Lean Phase: Channels   Reassert Assumption: That it is feasible to manufacture the Bukka 5.1’s locally from locally sourced materials   Results:   Initially, it was believed that this experiment would be the least likely to be successful since Fiji is very poor in terms of resources. Thus, there was a heavy focus on the...

Stephen Dodd
by Stephen Dodd
3 Votes
Comments 1
Stephen Dodd

Lean Phase: Solution   Assumption: we assume that the Buka DRAGON is more efficient and scalable than the Buka 4.0, therefore, testing is required to determine these assumptions.   Time Box: week 2-3   Key Metrics: the objective of the experiment is to see how fast does the Buka DRAGON boil 3 liters of water compared to the Buka 4.0, and if alterations are needed to be made to the Buka DRAGON. Success point: The Buka DRAGON boils the 3 liters of water faster than the Buka 4.0...

Stephen Dodd
by Stephen Dodd
3 Votes
Comments 0
Stephen Dodd
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to source the Buka 5.1’s by importing the metal pre-cut and assembling them in Fiji. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key...

Tariq Uddin
by Tariq Uddin
4 Votes
Comments 1
Tariq Uddin
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to manufacture the Bukka 5.1’s locally from locally sourced materials That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials locally to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key Metrics: Cost of materials and...

Stephen Dodd
by Stephen Dodd
3 Votes
Comments 2
Stephen Dodd
Proposed Experiment

Lean Phase: Channels Assumption: That it is feasible to manufacture the Buka 5.1’s locally from imported materials. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month. Time Box: 3 weeks Key Metrics: Cost of materials and...

Lucy Goss
by Lucy Goss
4 Votes
Comments 1
Lucy Goss
 

Stephen Dodd

Australia

Joined this community on Nov 15, 2018

University or Company
UNSW

Degree or Work area
Engineering

Country you Trekked/are Trekking in
Fiji

Reputation ranking

Ranking