Tariq Uddin's profile

Activity for Tariq Uddin

Showing: 6 Results
Sort by

Reference the Experiment Design Post [Proposed experiment] Exploring options with imported materials and local manufacturer for Buka stove 5.1   Reassert Lean Phase: Channels   Reassert Assumption: That it is feasible to manufacture the Buka 5.1’s locally from imported materials.   That the total cost of materials and manufacturing will be below $40FJD per stove.   That it is possible to source sufficient materials from an imported source to manufacture over 200...

Tariq Uddin
by Tariq Uddin
2 Votes
Comments 0
Tariq Uddin

Reference the Experiment Design Post: Exploring options for importing pre cut sheet metal for local assembly of Buka 5.0/5.1   Reassert Lean Phase: Channels Reassert Assumption: That it is feasible to source the Buka 5.1’s by importing the metal pre-cut and assembling them in Fiji. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves...

Tariq Uddin
by Tariq Uddin
3 Votes
Comments 11
Tariq Uddin
Idea thumbnail

Reference the Experiment Design Post Validating customer archetypes. Fuel Fiji, January 2019.   Lean Phase: Value Proposition, Customer Segmentation   Assumption: Testing 6 assumptions with the same success metrics and experiment builds:       1.)   The preference for firewood as cooking fuels presents as the dominant motive for stove purchase to a segment of our customers. This segment of customers may be identified by the commonality of being from rural and coastal...

Tariq Uddin
by Tariq Uddin
4 Votes
Comments 0
Tariq Uddin
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to source the Buka 5.1’s by importing the metal pre-cut and assembling them in Fiji. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key...

Tariq Uddin
by Tariq Uddin
4 Votes
Comments 1
Tariq Uddin
Proposed Experiment

Lean Phase: Channels   Assumption: That it is feasible to manufacture the Bukka 5.1’s locally from locally sourced materials That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials locally to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month.   Time Box: 3 weeks   Key Metrics: Cost of materials and...

Stephen Dodd
by Stephen Dodd
3 Votes
Comments 2
Stephen Dodd
Proposed Experiment

Lean Phase: Channels Assumption: That it is feasible to manufacture the Buka 5.1’s locally from imported materials. That the total cost of materials and manufacturing will be below $40FJD per stove. That it is possible to source sufficient materials from an imported source to manufacture over 200 stoves per month in Fiji. That local manufacturers have the capacity to manufacture over 200 stoves a month. Time Box: 3 weeks Key Metrics: Cost of materials and...

Lucy Goss
by Lucy Goss
4 Votes
Comments 1
Lucy Goss
 

Tariq Uddin

Sydney, Australia

Joined this community on Nov 15, 2018

University or Company
UOW

Degree or Work area
Engineering

Reputation ranking

Ranking
140
Points
146

Following

0 in this community